POWER SYSTEM STUDY

The Power System Study in which the typical track records are:

  • Sabah-Sarawak 275kV Interconnection Study
  • 300MW at kimanis, 275kV KK interconnection to SESB grid
  • 165MW Upper Padas Hydroelectric Project to SESB System
  • 300MW Coal Fired Plant at Lahad Datu Injection to 275kV SESB Grid
  • 190MW and 100MW IPP Gas Combine Cycle Plants respectively at KK
  • Power System Study on Transmission Planning options for Generation Schemes in Sabah’s Long Term 2600MW for Master Plan up to year 2025.
  • HVDC transmission options Vs HVAC options for 1200 MW Hydro from Sarawak to Sabah with SwedPower Consultant (Sweden) and Teshmont Consultant (Canada)