The Power System Study in which the typical track records are:
- Sabah-Sarawak 275kV Interconnection Study
- 300MW at kimanis, 275kV KK interconnection to SESB grid
- 165MW Upper Padas Hydroelectric Project to SESB System
- 300MW Coal Fired Plant at Lahad Datu Injection to 275kV SESB Grid
- 190MW and 100MW IPP Gas Combine Cycle Plants respectively at KK
- Power System Study on Transmission Planning options for Generation Schemes in Sabah’s Long Term 2600MW for Master Plan up to year 2025.