A renewable electricity company

Advanced Power Solutions (Borneo) Sdn. Bhd. (APSB)

Advanced APSB provides high quality of consultancy services to maintain high level of professional integrity and add value to our clients. APSB focuses on the Solar, Biomass and Biogas projects, Palm Oil industry, Transmission and Distribution projects for SESB and Government agents from the feasibility study stage, design stage, supervision stage until the projects are commissioned.

Delivering Quality and Innovation Across Sectors

We are a full-service Mechanical and Electrical Engineering consulting firm which provides high-quality professional services for various clients in both the public and private sectors.

Quality permeates our culture. We employ a quality staff; we provide employees with a quality work environment; we pursue and nurture relationships with quality clients. As a result, we produce quality work. The utilities, state and federal agencies, and private sector clients with whom we work expect quality, so we are constantly looking for ways to enhance the product we deliver.

We have vast experience to deal with Solar, Biomass, Biogas, 132kV Transmission lines, 132kV PMU, 33kV PPU and 11kV PE projects. Our roles are:

  • Design, supervision and commissioning on design and built or/and on conventional projects
  • Power System Study
  • Design & specification, tender document preparation, evaluation and recommendations

The 132kV, 33kV and 11kV Turkey projects in which the typical track records are:

  • 132kV 70km of 132kV transmission line from Tenom to Nabawan, Sabah and one PMU 132/33kV with 2x30MVA
  • substation and one switching station SSU at Tenom.
  • 76km of 132kV Transmission line for SESB from PMU Kota Belud to Ranau and a new PMU 132/33 at Ranau.
  • 132kV PMU Apas at Tawau; PMU Inanam & PMU Karamusing at Kota Kinabalu,
  • PMC for 33kV PPU Kayau, PPU Limbawang, PPU Lakut, PPU Kent, PPU Luyang in SESB System
  • 14.6 km of 33kV Submarrine Cable from PPU Pasir Putih to Sebatik Island, SESB.
  • 33kV/11kV line extension to TSH, TSH Wilmar, Balung mill etc
  • 11kV PE design for private and SESB.

The Power System Study in which the typical track records are:

  • Sabah-Sarawak 275kV Interconnection study
  • 300MW at kimanis, 275kV KK interconnection to SESB grid
  • 165MW Upper Padas Hydroelectric Project to SESB System
  • 300MW coal fired plant at Lahad Datu injection to 275kV SESB grid
  • 190MW and 100MW IPP Gas Combine Cycle Plants respectively at KK
  • Power System Study on transmission planning options for generation schemes in Sabah’s Long Term 2600MW for Master Plan up to year 2025.
  • HVDC transmission options Vs HVAC options for 1200 MW Hydro from Sarawak to Sabah with SwedPower consultant (Sweden) and Teshmont consultant (Canada)

Our Team

Led by its founder and Chairman cum Managing Director, Ir. Wong Ching Hwa, Director, Ir. Koo Yuk Liong and Director Ir. Yan Ngai Nen, the APSB management team is comprised of individuals.

Discover more

Our Services

Working with system studies is a complex issue as it affects many parameters in the development of the power system.

Discover more

Our Profile

Since 2006, Advanced Power Solutions (Borneo) Sdn. Bhd. (APSB) has provided electrical and mechanical engineering services to government agencies, and private clients.

Discover more

To Our Valued Clients

Mission

It is our mission to manage our clients risk, to optimise design and construction costs, and to protect human health and the environment by delivering strategic, sustainable, and technically sound services.

We demonstrate a thorough understanding of our client’s needs and work closely with them to define achievable targets, objectives, and expectations.

We are committed to providing our clients with the highest quality of service at a competitive price and in a timely manner.