We have vast experiences to deal with Solar, Biomass, Biogas, 275kV/132kV Transmission lines, 275/132/33/11kV Substation (PMU), 33/11kV Substation (PPU), and 11kV Substation (PE) projects.

ELECTRICAL SUBSTATION /TRANSMISSION LINES/DISTRIBUTION LINES PROJECTS/

The 275kV, 132kV, 33kV and 11kV projects in which the typical track records are:

  • 275kV Central Link Phase 1: PMU 275/132/33kV
  • 132kV 70km of 132kV transmission line from Tenom to Nabawan, Sabah and one PMU 132/33kV with 2x30MVA substation and one switching station SSU at Tenom.
  • 76km of 132kV Transmission line from PMU Kota Belud to Ranau and a new PMU 132/33 at Ranau.
  • 132kV PMU Apas at Tawau; PMU Inanam & PMU Karamusing at Kota Kinabalu,
  • PMC for 33kV PPU Kayau, PPU Limbawang, PPU Lakut, PPU Kent, PPU Luyang, PP Brumas to SESB grid system
  • 14.6 km of 33kV Submarrine Cable from PPU Pasir Putih to Sebatik Island.
  • 33kV/11kV line extension projects
  • 11kV PE design for private sector and SESB.